Public Groups Area » Public ProjectView
ProjectView
All Projects
showing 701–800 of 2268 projects | page « 1 2 3 4 ... 6 7 8 9 10 ... 20 21 22 23 »
Name![]() | Start Date | Completion Date | State | % Complete |
---|---|---|---|---|
page=projects&type=projects | ||||
page=projects&type=project | ||||
INCITS 485-2014[R2019]: Information Technology - Fibre Channel - Single-Byte Command Code Sets Mapping Protocol - 5 (FC-SB-5)
| 2019-04-22 | 2019-12-09 | Published | 100% |
page=projects&type=project | ||||
INCITS 487-2018: Information technology - Fibre Channel - Link Services - 3 (FC-LS-3)
| 2011-05-09 | 2018-07-10 | Published | 100% |
page=projects&type=project | ||||
INCITS 488-2016[R2021]: Information Technology - Fibre Channel - Framing And Signaling - 4 (FC-FS-4)
| 2020-11-18 | 2021-08-30 | Published | 100% |
page=projects&type=project | ||||
INCITS 489-2014[R2019]: Information technology - SCSI over PCIe (RTM) architecture (SOP)
| 2019-05-06 | 2019-12-09 | Published | 100% |
page=projects&type=project | ||||
INCITS 49-1975[S2017]: Character Set for Optical Character Recognition (OCR-B)
| 2007-01-01 | 2017-08-04 | Published-Stabilized | 100% |
page=projects&type=project | ||||
INCITS 491-2017: Information technology - SCSI/ATA Translation - 4 (SAT-4)
| 2011-09-26 | 2017-07-28 | Published | 100% |
page=projects&type=project | ||||
INCITS 492-2015[R2020]: Information technology - SAS Protocol Layer (SPL-3)
| 2019-10-08 | 2019-10-08 | Published | 100% |
page=projects&type=project | ||||
INCITS 493-2012 [R2017]: Information Technology - AT Attachment-8 - Serial Transport (ATA8-AST)
| 2017-04-25 | 2017-12-14 | Published | 100% |
page=projects&type=project | ||||
INCITS 494-2012[R2017]: Information technology - Role Based Access Control - Policy Enhanced
| 2017-04-27 | 2017-12-04 | Published | 100% |
page=projects&type=project | ||||
INCITS 495-2012[R2017]: Information Technology - Platform Management Specification, Volumes 1 and 2
| 2017-04-25 | 2017-12-29 | Published | 100% |
page=projects&type=project | ||||
INCITS 496-2012/AM1-2015[R2020]: Information Technology - Fibre Channel - Security Protocols - 2/Amendment 1 -(FC-SP-2/AM1)
| 2020-02-27 | 2020-10-15 | Published | 100% |
page=projects&type=project | ||||
INCITS 497-2012[R2017]: Information Technology – Automation/Drive Interface Commands - 3 (ADC - 3)
| 2017-04-25 | 2017-12-29 | Published | 100% |
page=projects&type=project | ||||
INCITS 498-2012[R2017] - Information technology - CIM Representations of Management Specification
| 2017-04-25 | 2017-12-29 | Published | 100% |
page=projects&type=project | ||||
INCITS 501-2016[R2021]: Information technology - Security Features for SCSI Commands (SFSC)
| 2020-11-18 | 2021-08-27 | Published | 100% |
page=projects&type=project | ||||
INCITS 502-2019: Information technology - SCSI Primary Commands - 5 (SPC-5)
| 2012-03-19 | 2019-12-31 | Published | 100% |
page=projects&type=project | ||||
INCITS 503-2022/AM1-202x: Information technology - SCSI Stream Commands-5 (SSC-5) Amendment 1 (SSC-5-AM1)
| 2022-06-02 | - | Development-PrePR | 40% |
page=projects&type=project | ||||
INCITS 503-2022: Information technology - SCSI Stream Commands - 5 (SSC-5)
| 2012-03-19 | 2022-02-15 | Published | 100% |
page=projects&type=project | ||||
INCITS 504-1-2013/AM 1-2016[R2021]: Information technology - Generic Identity Command Set Part 1: Card Application Command Set - Amendment 1
| 2020-11-18 | 2021-08-27 | Published | 100% |
page=projects&type=project | ||||
INCITS 504-1-2013[R2018]: Information technology – Generic Identity Command Set –(GICS) - Part 1: Card Application Command Set
| 2018-06-21 | 2018-12-31 | Published | 100% |
page=projects&type=project | ||||
INCITS 504-2-2013/AM 1-2016[R2021]: Information Technology - Generic Identity Command Set - Part 2: Card Administrative Command Set - Amendment 1
| 2020-11-18 | 2021-08-27 | Published | 100% |
page=projects&type=project | ||||
INCITS 504-2-2013[R2018]: Information technology - Generic Identity Command Set (GICS) - Part 2: Card Administrative Command Set
| 2018-06-21 | 2018-12-31 | Published | 100% |
page=projects&type=project | ||||
INCITS 504-3-2016[R2021]: Information Technology -Generic Identity Command Set Part 3: GICS Platform Testing Requirements
| 2020-11-18 | 2021-08-27 | Published | 100% |
page=projects&type=project | ||||
INCITS 504-4-2013[R2018]: Information technology - Generic Identity Command Set (GICS) - Part 4: Card Application Profile
| 2018-06-21 | 2018-12-31 | Published | 100% |
page=projects&type=project | ||||
INCITS 505-2013[R2018]: Information technology - SAS Protocol Layer - 2 (SPL-2)
| 2018-06-28 | 2018-12-31 | Published | 100% |
page=projects&type=project | ||||
INCITS 506-2021: Information technology - SBC-4 (SCSI Block Commands - 4)
| 2012-09-25 | 2021-07-06 | Published | 100% |
page=projects&type=project | ||||
INCITS 507-2016[R2021]: Information technology - PCIe® architecture Queuing Interface - 2(PQI-2)
| 2020-11-18 | 2021-08-27 | Published | 100% |
page=projects&type=project | ||||
INCITS 508-2014[R2019]: Information Technology - Storage Management - Host Bus Adapter Application Programming Interface - 2nd Generation (SM-HBA-2)
| 2019-04-22 | 2019-11-04 | Published | 100% |
page=projects&type=project | ||||
INCITS 509-2014[R2019]: Information Technology - Fibre Channel - Backbone - 6 (FC-BB-6)
| 2019-04-22 | 2019-12-09 | Published | 100% |
page=projects&type=project | ||||
INCITS 510-2017: Information technology - Fibre Channel – Generic Services – 7 (FC-GS-7)
| 2010-01-10 | 2017-09-28 | Published | 100% |
page=projects&type=project | ||||
INCITS 511-2016[R2021]: Information Technology - Fibre Channel - Switch Fabric - 6 (FC-SW-6)
| 2020-11-18 | 2021-08-27 | Published | 100% |
page=projects&type=project | ||||
INCITS 512-2015[R2020]: Information Technology - Fibre Channel - Physical Interface-6 (FC-PI-6)
| 2020-02-27 | 2020-10-15 | Published | 100% |
page=projects&type=project | ||||
INCITS 513-2015[R2020]: Information technology SCSI Primary Commands 4 (SPC-4)
| 2020-02-11 | 2020-10-08 | Published | 100% |
page=projects&type=project | ||||
INCITS 514-2014[R2019]: Information technology - SCSI Block Commands - 3 (SBC-3)
| 2019-05-06 | 2019-12-10 | Published | 100% |
page=projects&type=project | ||||
INCITS 515-2016[R2021]: Information technology - SCSI Architecture Model - 5 (SAM-5)
| 2020-11-18 | 2021-08-27 | Published | 100% |
page=projects&type=project | ||||
INCITS 516-2013[R2018]: Information technology - SCSI Stream Commands (SSC-4)
| 2018-06-28 | 2018-12-31 | Published | 100% |
page=projects&type=project | ||||
INCITS 517-2015[R2020]: Information technology – SCSI / ATA Translation – 3 (SAT-3)
| 2020-02-11 | 2020-10-08 | Published | 100% |
page=projects&type=project | ||||
INCITS 518-2017: Information technology - SCSI Enclosure Services - 3 (SES-3)
| 2009-02-09 | 2017-07-28 | Published | 100% |
page=projects&type=project | ||||
INCITS 519-2014[R2019]: Information technology - Serial Attached SCSI-3 (SAS-3)
| 2019-05-06 | 2019-12-16 | Published | 100% |
page=projects&type=project | ||||
INCITS 52-1976[S2017]: Unrecorded Single Disk Cartridge (Front Loading, 22000 BPI), General, Physical, and Magnetic Requirements
| 2007-01-01 | 2017-08-04 | Published-Stabilized | 100% |
page=projects&type=project | ||||
INCITS 522-2014/AM 1-2018: Information technology - ATA/ATAPI Command Set - 3 (ACS-3) - Amendment 1
| 2016-11-15 | 2018-12-31 | Published | 100% |
page=projects&type=project | ||||
INCITS 522-2014[R2020]: Information Technology - ATA/ATAPI Command Set - 3 (ACS-3)
| 2020-03-02 | 2020-10-08 | Published | 100% |
page=projects&type=project | ||||
INCITS 524-2016[R2021]: Information Technology - AT Attachment 8 - ATA/ATAPI Parallel Transport (ATA8-APT)
| 2020-11-18 | 2021-08-09 | Published | 100% |
page=projects&type=project | ||||
INCITS 528-2013[R2018]: Information Technology - Common Building Blocks Specification
| 2018-06-19 | 2018-12-31 | Published | 100% |
page=projects&type=project | ||||
INCITS 529-2018: Information technology - ATA/ATAPI Command Set - 4 (ACS-4)
| 2013-03-20 | 2018-09-21 | Published | 100% |
page=projects&type=project | ||||
INCITS 53-1976[S2018]: Information Systems - Programming Language PL/I
| 2008-01-01 | 2018-11-16 | Published-Stabilized | 100% |
page=projects&type=project | ||||
INCITS 530-2013[R2018]: Information Technology - Architecture for Managed Computing Systems
| 2018-06-19 | 2018-12-31 | Published | 100% |
page=projects&type=project | ||||
INCITS 531-2013[R2018]: Information Technology - Systems Management Discovery for Managed Computer Systems
| 2018-06-19 | 2018-12-31 | Published | 100% |
page=projects&type=project | ||||
INCITS 532-2014[R2019]: Information Technology - Vocabulary Description and Management
| 2019-05-01 | 2019-10-29 | Published | 100% |
page=projects&type=project | ||||
INCITS 533-2016[R2021]: Information Technology - Fibre Channel - Physical Interface - 6P (FC-PI-6P)
| 2020-11-18 | 2021-08-30 | Published | 100% |
page=projects&type=project | ||||
INCITS 534-2019: Information technology - Serial Attached SCSI - 4 (SAS-4)
| 2013-10-08 | 2019-02-08 | Published | 100% |
page=projects&type=project | ||||
INCITS 536-2016/AM 1-2019 - Information technology - Zoned Block Commands - Amendment 1 (ZBC-AM 1)
| 2018-04-24 | 2019-02-13 | Published | 100% |
page=projects&type=project | ||||
INCITS 536-2016[R2021]: Information technology – Zoned Block Commands (ZBC)
| 2020-11-18 | 2021-08-27 | Published | 100% |
page=projects&type=project | ||||
INCITS 537-2016/AM 1-2019 - Information technology - Zoned-device ATA Commands Amendment 1 (ZAC-AM1)
| 2018-02-27 | 2019-09-23 | Published | 100% |
page=projects&type=project | ||||
INCITS 537-2016[R2021]: Information technology Zoned Device ATA Command Set (ZAC)
| 2020-11-18 | 2021-08-09 | Published | 100% |
page=projects&type=project | ||||
INCITS 538-2018: Information technology - SAS Protocol Layer - 4 (SPL-4)
| 2014-02-06 | 2018-07-26 | Published | 100% |
page=projects&type=project | ||||
INCITS 539-2016[R2021]: Information Technology - Management Of Security Credentials
| 2020-11-18 | 2021-08-27 | Published | 100% |
page=projects&type=project | ||||
INCITS 54-1986[S2017]: Recorded Magnetic Tape for Information Interchange (6250 CPI, Group Coded Recording)
| 2007-01-01 | 2017-08-04 | Published-Stabilized | 100% |
page=projects&type=project | ||||
INCITS 540-2018/AM 1-2019 - Information technology - Fibre Channel - Non-Volatile Memory Express - Amendment 1 (FC-NVMe-AM 1)
| 2018-05-01 | 2019-04-30 | Published | 100% |
page=projects&type=project | ||||
INCITS 540-2018: Information technology - Fibre Channel - Non-Volatile Memory Express (FC-NVMe)
| 2014-05-07 | 2018-04-05 | Published | 100% |
page=projects&type=project | ||||
INCITS 541-202x: Information technology - Automation/Drive Interface Commands - 4 (ADC-4)
| 2014-07-28 | - | Development-PrePR | 40% |
page=projects&type=project | ||||
INCITS 542-2022: Information technology - Automation/Drive Interface Transport Protocol - 3 (ADT-3)
| 2014-07-29 | 2022-07-11 | Published | 100% |
page=projects&type=project | ||||
INCITS 543-2019: Information technology - Fibre Channel - Physical Interfaces - 7 (FC-PI-7)
| 2014-11-12 | 2019-11-15 | Published | 100% |
page=projects&type=project | ||||
INCITS 544-2018: Information technology - Fibre Channel - Single Byte Command Code Sets Mapping Protocol - 6 (FC-SB-6)
| 2015-02-02 | 2018-06-12 | Published | 100% |
page=projects&type=project | ||||
INCITS 545-2019: Information technology - Fibre Channel - Framing and Signaling - 5 (FC-FS-5)
| 2015-03-11 | 2019-04-30 | Published | 100% |
page=projects&type=project | ||||
INCITS 546-2021: Information technology - SCSI Architecture Model - 6 (SAM-6)
| 2015-05-21 | 2021-10-15 | Published | 100% |
page=projects&type=project | ||||
INCITS 547-2020: Information technology - Fibre Channel - Switch Fabric - 7 (FC-SW-7)
| 2015-10-02 | 2020-02-24 | Published | 100% |
page=projects&type=project | ||||
INCITS 548-2020: Information technology - Fibre Channel - Generic Services - 8 (FC-GS-8)
| 2015-10-02 | 2020-03-02 | Published | 100% |
page=projects&type=project | ||||
INCITS 549-2022: Zoned Device ATA Command Set - 2 (ZAC-2)
| 2016-02-26 | 2022-06-23 | Published | 100% |
page=projects&type=project | ||||
INCITS 55-1992[S2017]: Information Systems - Unrecorded Magnetic Tape Cartridge for Information Interchange - 0.250 Inch (6.30 mm), 1600 bpi (63 bpmm), Phase Encoded
| 2007-01-01 | 2017-08-04 | Published-Stabilized | 100% |
page=projects&type=project | ||||
INCITS 550-202x: Information technology - Zoned Block Commands - 2 (ZBC-2)
| 2016-03-03 | - | Public Review | 60% |
page=projects&type=project | ||||
INCITS 551-2019: Information technology - SCSI RDMA Protocol - 2 (SRP-2)
| 2016-03-03 | 2019-11-07 | Published | 100% |
page=projects&type=project | ||||
INCITS 553-2020: Information Technology - Fibre Channel - Link Services - 4 (FC-LS-4)
| 2016-03-23 | 2020-09-28 | Published | 100% |
page=projects&type=project | ||||
INCITS 554-202x: Information technology - SAS Protocol Layer - 5 (SPL-5)
| 2016-12-16 | - | Public Review | 60% |
page=projects&type=project | ||||
INCITS 555-2020: Information technology - SCSI Enclosure Services - 4 (SES-4)
| 2017-01-17 | 2020-12-28 | Published | 100% |
page=projects&type=project | ||||
INCITS 556-2020: Fibre Channel – Non-Volatile Memory Express - 2 (FC-NVMe-2)
| 2017-02-01 | 2020-05-28 | Published | 100% |
page=projects&type=project | ||||
INCITS 557-202x: Information Technology - SCSI / ATA Translation - 5 (SAT-5)
| 2017-05-18 | - | Development-PrePR | 40% |
page=projects&type=project | ||||
INCITS 558-2021 - Information technology - ATA Command Set - 5 (ACS-5)
| 2017-10-10 | 2021-10-12 | Published | 100% |
page=projects&type=project | ||||
INCITS 559-2020: Information technology - Fibre Channel - Physical Interfaces - 7P (FC-PI-7P)
| 2017-10-24 | 2020-12-28 | Published | 100% |
page=projects&type=project | ||||
INCITS 56-1986[S2017]: Recorded Magnetic Tape Cartridge for Information Interchange (4-Track, 0.250 Inch, 1600 BPI, Phase Encoded)
| 2007-01-01 | 2017-08-04 | Published-Stabilized | 100% |
page=projects&type=project | ||||
INCITS 561-202x - Information Technology - Serial Attached SCSI - 5 (SAS-5)
| 2018-04-24 | - | Development-PrePR | 40% |
page=projects&type=project | ||||
INCITS 563-202x - Information technology - Fibre Channel Protocol for SCSI (FCP-5)
| 2018-08-15 | - | Public Review | 60% |
page=projects&type=project | ||||
INCITS 565-2020 - Information technology - Next Generation Access Control
| 2018-10-29 | 2020-04-10 | Published | 100% |
page=projects&type=project | ||||
INCITS 566-202x: Information technology –SCSI Primary Commands - 6 (SPC-6)
| 2019-01-23 | - | Development-PrePR | 40% |
page=projects&type=project | ||||
INCITS 567-202x: Information technology – Serial Attached SCSI – 4.1 (SAS 4.1)
| 2019-01-23 | - | Public Review | 60% |
page=projects&type=project | ||||
INCITS 571-202x: Information technology - SCSI Block Commands - 5 (SBC-5)
| 2019-12-04 | - | Development-PrePR | 40% |
page=projects&type=project | ||||
INCITS 572-2021: Information technology - USB Attached SCSI – 3 (UAS-3)
| 2019-12-04 | 2021-07-06 | Published | 100% |
page=projects&type=project | ||||
INCITS 574-202x - Information Technology - ATA Command Set - 6 (ACS-6)
| 2020-08-18 | - | Development-PrePR | 40% |
page=projects&type=project | ||||
INCITS 575-202x-Information Technology - Zoned Device ATA Command Set - 3 (ZAC-3)
| 2021-05-13 | - | Development-PrePR | 40% |
page=projects&type=project | ||||
INCITS 578-202x - Information technology - SCSI / ATA Translation - 6 (SAT-6)
| 2022-02-17 | - | Development-PrePR | 40% |
page=projects&type=project | ||||
INCITS 579-202x - Information Technology - Zoned Block Commands - 3 (ZBC-3)
| 2022-02-17 | - | Development-PrePR | 40% |
page=projects&type=project | ||||
INCITS 58-1977[S2017]: Unrecorded Eleven-Disk Pack - General, Physical, and Magnetic Requirements
| 2007-01-01 | 2017-08-04 | Published-Stabilized | 100% |
page=projects&type=project | ||||
INCITS 580-202x: Information technology - Inclusive Terminology
| 2022-05-13 | - | New Work-PINS | 40% |
page=projects&type=project | ||||
INCITS 62-1987AM 1-1999[S2017]: Information Systems - Optical Character Recognition (OCR) - Paper Used in OCR Systems - Amendment 1
| 2007-01-01 | 2017-08-04 | Published-Stabilized | 100% |
page=projects&type=project | ||||
INCITS 62-1987[S2017]: Information Systems - Optical Character Recognition (OCR) - Paper Used in OCR Systems
| 2007-01-01 | 2017-08-04 | Published-Stabilized | 100% |
page=projects&type=project | ||||
INCITS 72-1981[S2018]: Parallel Recorded Magnetic Tape Cartridge for Information Interchange, 4-Track, 0.250 Inch (6.30 mm), 1600 bpi (63 bpmm), Phase Encoded
| 2008-01-01 | 2018-08-10 | Published-Stabilized | 100% |
page=projects&type=project | ||||
INCITS 73-1980[S2017]: Cartridge, Single-Sided Unformatted Flexible Disk (for 6631 BPR Use)
| 2007-01-01 | 2017-08-04 | Published-Stabilized | 100% |
page=projects&type=project | ||||
INCITS 74-1987[S2018]: Information Systems - Programming Language - PL/I General-Purpose Subset
| 2008-01-01 | 2018-11-16 | Published-Stabilized | 100% |
page=projects&type=project | ||||
INCITS 76-1981[S2017]: Unformatted Single Disk Cartridge (Top Loading, 200 TPI, 4400 BPI) - General, Physical, and Magnetic Requirements
| 2007-01-01 | 2017-08-04 | Published-Stabilized | 100% |
page=projects&type=project | ||||
INCITS 82-1980[S2021]: One-Sided Single-Density Unformatted 5.25 Inch Flexible Disk Cartridge
| 2011-01-01 | 2021-04-30 | Published-Stabilized | 100% |
page=projects&type=project | ||||
INCITS 83-1995[R2020]: Information Systems - ISO Registration According To ISO 2375 - ANSI Sponsorship Procedures
| 2020-02-24 | 2020-10-19 | Published | 100% |
showing 701–800 of 2268 projects | page « 1 2 3 4 ... 6 7 8 9 10 ... 20 21 22 23 »
* Estimated completion date