eb-2012-01102
INCITS
International
Committee for Information Technology Standards
INCITS Secretariat, Information Technology Industry Council (ITI)
1101 K Street, NW, Suite 610, Washington, DC 20005
Date:
|
September 27, 2012
|
Ref. Doc.:
|
eb-2012-01102
|
Reply to:
|
Deborah J. Spittle, Associate Manager,
Standards Operations
|
Phone:
|
202-626-5746
|
Email:
|
dspittle@itic.org
|
Notification of Public Review and Comments
Register for the Withdrawal of a National Standard(s) in INCITS/B10 and INCITS/L3. The public review
period is from September 28, 2012 to November 12, 2012.
INCITS/ISO/IEC 10373-6:2001/AM1:2007
[2008],
Identification cards
- Test methods - Part 6: Proximity cards - Amendment 1: Protocol test methods
for proximity cards
INCITS/ISO/IEC 10373-6:2001/AM2:2003
[2008],
Identification cards - Test methods - Part 6: Proximity cards -
Amendment 2: Improved RF test methods
INCITS/ISO/IEC 10373-6:2001/AM4:2006
[2008],
Identification cards - Test methods - Part 6: Proximity cards -
AMENDMENT 4: Additional test methods for PCD RF interface and PICC alternating
field exposure
INCITS/ISO/IEC 10373-6:2001/AM5:2007
[2009],
Identification cards - Test methods - Part 6: Proximity cards - Amendment
5: Bit rates of fc/64, fc/32 and fc/16
INCITS/ISO/IEC 7811-6:2001/AM1:2005[2008], Identification
cards - Recording technique - Part 6: Magnetic stripe - High coercivity -
Amendment 1: Ui6 criteria and test method
INCITS/ISO/IEC 14443-2:2001/AM1:2005
[2005], Identification cards - Contactless integrated circuit(s) cards -
Proximity cards - Part 2: Radio frequency power and signal interface - Amendment
1: Bit rates of fc/64, fc/32 and fc/16
INCITS/ISO/IEC 14443-3:2001/AM1:2005
[2005],
Identification cards - Contactless integrated circuit(s) cards -
Proximity cards - Part 3: Initialization and anticollision - Amendment 1:
Bit rates of fc/64, fc/32 and fc/16
INCITS/ISO/IEC 29116-1:2008 [2009], Information technology - Supplemental
media technologies - Part 1: Media streaming application format protocols
If the action is to accept in whole or in part a proposal contained in the
comment, the changes should be sent to the Associate Manager of Standards
Operations together with any comments supporting the change. If the action
is to reject in whole or in part proposals contained in the comment, the
response should provide the rationale for the rejection.
The comment should be discussed at the
next meeting, and if not definitively responded to at once, an interim acknowledgment
should be sent along with an estimated date of action.
The final response to the commentor
must include the provision that the commentor has twenty working days from
the postmark of the committees response to indicate, in a written statement,
acceptance or rejection of the response.
No comments have
been received to date.