Notification of Public Review and Comments
Register for Reaffirmation of National Standards in INCITS/T11.
The public review period is from June 1, 2012 - July 16, 2012.
INCITS 435-2007
Information technology - Fibre Channel BaseT (FC-BaseT)
INCITS 411-2007
Information technology - iSCSI Management API, Version 1.1.6
INCITS 374:2003/AM 1-2007
Information technology - Single-Byte Command Set - 3 (FC-SB-3) Amendment 1 (FC-SB-3/AM1)
INCITS 432-2007
Information technology - Fabric Application Interface Standard (FAIS)
INCITS 428-2007
Information technology - Storage Management - Host Bus Adapter Application Programming Interface (SM-HBA)
INCITS 413-2007
Information technology - RapidIO(TM) Interconnect Specification (version 1.3)
INCITS 364:2003/AM 1-2007[]
Information technology - Fibre Channel - 10 Gigabit AMENDMENT 1 (10GFC/AM1)
INCITS/ISO/IEC 14165-414:2007-[2007]
Information technology - Fibre Channel Generic Services-4 (FC-GS-4)
INCITS 427-2007
Information technology - Fibre Channel Generic Services-5 (FC-GS-5)
INCITS 433-2007
Information technology - Fibre Channel - Link Services (FC-LS)
INCITS 424-2007
Information technology - Fibre Channel Framing and Signaling - 2 (FC-FS-2)
INCITS 426-2007
Information technology - Fibre Channel Security Protocols (FC-SP)
INCITS 424:2007/AM 1-2007
Information technology - Fibre Channel - Framing and Signaling - 2 AMENDMENT 1 (FC-FS-2/AM1)
If the TC action is to accept in
whole or in part a proposal contained in the comment, the changes should be sent
to the Associate Manager of Standards Operations together with any comments
supporting the change. If the TC action is to reject in whole or in part
proposals contained in the comment, the response should provide the rationale
for the rejection.
The
comment should be discussed at the next TC meeting, and if not definitively
responded to at once, an interim acknowledgment should be sent along with an
estimated date of action.
The
final response to the commentor must include the provision that the commentor
has twenty working days from the postmark of the committees response to
indicate, in a written statement, acceptance or rejection of the TC response.
No comments have been received