eb-2012-00261


InterNational Committee for Information Technology Standards

INCITS Secretariat, Information Technology Industry Council (ITI)
1101 K St. NW, Suite 610, Washington, DC 20005
Telephone 202-737-8888; Fax 202-638-4922;
Email: incits@itic.org


ACTION REQUESTED  

Date: 
March 13, 2012
Project:
n/a
Reply to:
Deborah J. Spittle
Phone:
202-626-5746
Email:
dspittle@itic.org




To:
U.S. TAG Administrator to SC7 TAG: M. Zaman
Subject:
Advance Transmittal of ISO/IEC IEEE FDIS 31320-1, Information technology - Modeling Languages -Part 1: Syntax and Semantics for IDEF0)



SC7 TAG Recommendation Due:
June 12, 2012
INCITS EB Letter Ballot (30-Days):
June 13, 2012 - July 12, 2012
INCITS EB Ballot Resolution Period:
July 13, 2012 - July 22, 2012
U.S. Vote to ANSI:
July 23, 2012
JTC 1 Closing Date:
August 5, 2012


The subject-referenced FDIS is enclosed for action and information as indicated. This document is distributed for ISO/IEC JTC 1 final letter ballot under the FAST-TRACK PROCEDURE. The U.S. TAG is required to recommend a vote for the National Body.


ATTENTION U.S. TAG to SC7


The committee is to coordinate and develop the U.S. recommended position to INCITS EB for approval for submission to ISO/IEC JTC 1. The position must be submitted in a format consistent with the guidelines specified by the JTC 1 Supplement.

The position options are:

• Approval of the technical content of the FDIS as presented (editorial or other comments may be
appended);

• Disapproval of the FDIS (or FDAM) for technical reasons to be stated, with proposals for changes that would
make the document acceptable (acceptance of these proposals shall be referred to the NB concerned for
confirmation that the vote can be changed to approval);

• Abstention.

[Note: Conditional approval should be submitted as a disapproval vote.]

Any comments developed in support of the U.S. position should be presented in the ISO Comments Template document.

All recommendations should be supported with documentation.


IMPORTANT


The recommendation should be received at the INCITS Secretariat not later than the due date noted above for approval by an INCITS EB letter ballot, so that, if necessary, the Executive Board letter ballot resolution meeting may be conducted and the U.S. vote forwarded to ANSI prior to to the JTC 1 closing date of August 5, 2012.

[NOTE: This DIS will be sent to US SC TAGs for comments (if any) for consideration when developing the recommendation for US vote.]

ACTION REQUIRED BY INCITS EXECUTIVE BOARD

INCITS EB members are requested to begin their review of the document in preparation for expeditiously determining their vote when the U.S. TAG recommendation is submitted for approval.