INCITS Secretariat, Information Technology
Industry Council (ITI)
1101
K St. NW, Suite 610, Washington, DC 20005
Telephone
202-737-8888; Fax 202-638-4922;
Email:
incits@itic.org
ACTION REQUESTED
Date: |
March 13, 2012 |
Project: |
n/a |
Reply to: |
Deborah J. Spittle |
Phone: |
202-626-5746 |
Email: |
dspittle@itic.org |
To: |
U.S. TAG Administrator to SC7 TAG:
M. Zaman |
Subject: |
Advance Transmittal of ISO/IEC
IEEE FDIS 31320-1, Information technology - Modeling Languages
-Part 1: Syntax and Semantics for IDEF0) |
SC7 TAG Recommendation Due: |
June 12, 2012 |
INCITS EB Letter Ballot (30-Days): |
June 13, 2012 - July 12, 2012 |
INCITS EB Ballot Resolution Period: |
July 13, 2012 - July 22, 2012 |
U.S. Vote to ANSI: |
July 23, 2012 |
JTC 1 Closing Date: |
August 5, 2012 |
The subject-referenced FDIS is enclosed for action and information as indicated. This document is distributed for ISO/IEC JTC 1 final letter ballot under the FAST-TRACK PROCEDURE. The U.S. TAG is required to recommend a vote for the National Body.
ATTENTION U.S. TAG to SC7
The committee is to coordinate and develop the U.S. recommended
position to INCITS EB for approval for submission to ISO/IEC JTC 1.
The position must be submitted in a format consistent with the guidelines
specified by the JTC 1 Supplement.
The position options are:
• Approval of the technical content
of the FDIS as presented (editorial or other comments may be
appended);
• Disapproval of the FDIS (or FDAM)
for technical reasons to be stated, with proposals for changes that
would
make the document acceptable (acceptance of these proposals
shall be referred to the NB concerned for
confirmation that the vote can be changed to approval);
• Abstention.
[Note: Conditional approval should be
submitted as a disapproval vote.]
Any comments developed in support of the U.S. position should be presented in the ISO Comments Template document.
All recommendations should be
supported with documentation.
IMPORTANT
The recommendation should be received at the INCITS Secretariat
not later than the due date noted above for approval by an INCITS
EB letter ballot, so that, if necessary, the Executive Board letter
ballot resolution meeting may be conducted and the U.S. vote forwarded
to ANSI prior to to the JTC 1 closing date of August 5, 2012.
[NOTE: This DIS will be sent to US
SC TAGs for comments (if any) for consideration when developing the recommendation
for US vote.]
ACTION REQUIRED BY INCITS EXECUTIVE BOARD
INCITS EB members are requested to begin their review of the document in preparation for expeditiously determining their vote when the U.S. TAG recommendation is submitted for approval.