Name eb-2017-00299-Reaffirmations-Comments-due-08-08-2017.pdf (207K)
Description Public Review and Comments Register for the Reaffirmation of Standards listed below.

The public review is from June 9, 2017 to August 8, 2017.

INCITS 149-1986[R2012] Financial Services - Financial Transaction Card Formsets - Location of Imprinted Information

INCITS/ISO/IEC 7816-3:2006[R2012] Identification cards - Integrated circuit(s) cards with contacts - Part 3: Electronic interface and transmission protocols (Third Edition)

INCITS/ISO/IEC 29100:2011[2012] Information technology - Security techniques - Privacy framework

INCITS/ISO/IEC 11770-5:2011[2012] Information technology -- Security techniques - Key Management - Part 5: Group key management

INCITS/ISO/IEC 9796-2:2010[2012] Information technology - Security techniques - Digital signature schemes giving message recovery - Part 2: Integer factorization based mechanisms

INCITS/ISO/IEC 15946-5:2009[2012] Information technology - Security techniques - Cryptographic techniques based on elliptic curves - Part 5: Elliptic Curve Generation

INCITS/ISO/IEC 9797-2:2011[2012] Information technology - Security techniques - Message authentication codes (MACs) - Part 2: Mechanisms using a hash-function (3rd
INCITS/ISO/IEC 19792:2009[2012] Information technology - Security techniques - Security evaluation of biometrics

INCITS/ISO/IEC 15408-1:2009[2012] Information technology - Security techniques - Evaluation Criteria for IT Security - Part 1: Introduction and general model

INCITS 494-2012 Information technology - Role Based Access Control -- Policy Enhanced

INCITS/ISO/IEC 18033-3:2010[2012] Information technology - Security techniques - Encryption algorithms - Part 3: Block ciphers

INCITS/ISO/IEC 13888-2:2010[2012] Information technology - Security techniques - Non-repudiation - Part 2: Mechanisms using symmetric techniques

INCITS/ISO/IEC 9798-6:2010[2012] Information technology - Security techniques - Entity authentication - Part 6: Mechanisms using manual data transfer

INCITS/ISO/IEC 27033-3:2010[2012] Information technology -- Security techniques -- Network security -- Part 3: Reference networking scenarios -- Threats, design techniques and control issues

INCITS/ISO/IEC 9797-3:2011[2012] Information technology - Security techniques - Message authentication codes (MACs) - Part 3: Mechanisms using a universal hash-function

INCITS/ISO/IEC 27007:2011[2012] Information technology -- Security techniques -- Guidelines for information security management systems auditing

INCITS/ISO/IEC 24745:2011[2012] Information technology - Security techniques - Biometric information protection

INCITS/ISO/IEC 29192-2:2012[2012] Information technology -- Security techniques -- Lightweight cryptography -- Part 2: Block ciphers

INCITS/ISO/IEC 18031:2011[2012] Information technology -- Security techniques -- Random bit generation

INCITS/ISO/IEC 9798-1:2010[2012] Information technology - Security techniques - Entity authentication - Part 1: General

INCITS/ISO/IEC 29128:2011[2012] Information technology - Security techniques - Verification of cryptographic protocols

INCITS 359-2012 Information Technology - Cyber Security - Role Based Access Control (RBAC)

INCITS/ISO/IEC 18033-4:2011[2012] Information technology - Security techniques - Encryption algorithms - Part 4: Stream ciphers

INCITS/ISO/IEC 29150:2011[2012] Information technology - Security techniques - Signcryption

INCITS/ISO/IEC 17203:2011[2012] Information technology -- Open Virtualization Format (OVF) specification

INCITS/ISO/IEC 16680:2012[2012] Information technology - The Open Group Service Integration Maturity Model (OSIMM)

INCITS/ISO/IEC 13249-6:2006[R2012] Information technology - Database languages - SQL - Multimedia and Application Packages - Part 6: Data Mining (2nd ed.)

INCITS/ISO/IEC 19773:2011[R2012] Information technology - Metadata Registries (MDR) modules

INCITS/ISO/IEC 15944-8:2012[2012] Information technology - Business operational view - Part 8: Identification of privacy protection requirements as external constraints on business transactions

INCITS/ISO/IEC 18023-3:2006/AM 1:2012[2012] Information technology - SEDRIS - Part 3: Transmittal format binary encoding AMENDMENT 1

INCITS/ISO/IEC 18024-4:2006/AM 1:2012[2012] Information technology - SEDRIS language bindings - Part C AMENDMENT 1

INCITS/ISO/IEC 18042-4:2006/AM1:2011[2012] Information technology - Computer graphics and image processing - Spatial Reference Model (SRM) language bindings - Part 4: C AMENDMENT 1

INCITS/ISO/IEC 18023-1:2006/AM 1:2012[2012] Information technology - SEDRIS - Part 1: Functional specification AMENDMENT 1

INCITS/ISO/IEC 26300:2006[R2012] Information technology - Open Document for Office Applications (OpenDocument) v1.0
INCITS/ISO 19111:2007[R2012] Geographic information - Spatial referencing by coordinates

INCITS/ISO 19134:2007[R2012] Geographic information - Location-based services - Multimodal routing and navigation

INCITS/ISO 19131:2007/AM1:2011[2012] Geographic information - Data product specification AMENDMENT 1

INCITS/ISO 19149:2011[2012] Geographic information - Right expression language for geographic information - GeoREL

INCITS/ISO 19118:2011[2012] Geographic information - Encoding

INCITS/ISO 19137:2007[R2012] Geographic information - Core profile of the spatial schema

INCITS/ISO 19156:2011[2012] Geographic information - Observations and measurements

INCITS 415-2006[R2012] Information technology - Homeland Security Mapping Standard - Point Symbology for Emergency Management

INCITS/ISO 19148:2012[2012] Geographic information - Linear Referencing System

INCITS/ISO/IEC 6937:2001[R2012] Information technology - Coded graphic character set for text communication - Latin alphabet

INCITS 4-1986[R2012] Information Systems - Coded character Sets - 7-Bit American National Standard Code for Information Interchange (7-Bit ASCII)

INCITS/ISO/IEC 15938-4:2002[R2012] Information technology - Multimedia content description interface - Part 4: Audio

INCITS/ISO/IEC 14496-1:2010[2012] Information technology - Coding of audio-visual objects - Part 1: Systems

INCITS/ISO/IEC 14496-3:2009[2012] Information technology - Coding of audio-visual objects - Part 3: Audio

INCITS/ISO/IEC 13818-9:1996[R2012] Information technology - Generic coding of moving pictures and associated audio information - Part 9: Extension for real-time interface for system decoders

INCITS/ISO/IEC 13818-3:1998[R2012] Information technology - Generic coding of moving pictures and associated audio information - Part 3: Audio (2nd Edition)

INCITS/ISO/IEC 13818-6:1998[R2012] Information technology - Generic coding of moving pictures and associated audio information - Part 6: Extensions for DSM-CC

INCITS/ISO/IEC 15938-2:2002[R2012] Information technology - Multimedia content description interface - Part 2: Description definition language

INCITS/ISO/IEC 15938-1:2002[R2012] Information technology - Multimedia content description interface - Part 1: Systems

INCITS/ISO/IEC 15938-3:2002[R2012] Information technology - Multimedia content description interface - Part 3: Visual

INCITS/ISO/IEC 13818-6:1998/AM3:2001[R2012] Information technology - Generic coding of moving pictures and associated audio information - Part 6: Extensions for DSM-CC - Amendment 3: Transport buffer model in support of synchronized user-to-network download protocol

INCITS/ISO/IEC 14496-2:2004[R2012] Information technology - Coding of audio-visual objects - Part 2: Visual

INCITS/ISO/IEC 14492:2001[R2012] Information technology - Lossy/Lossless coding of bi-level images

INCITS 434-2007[R2012] Information technology - Tenprint capture using BioAPI

INCITS 358:2002/AM 1-2007[R2012] Information technology - BioAPI Specification (version 1.1) - Amendment 1: Support for Biometric Fusion (INCITS 358:2002 AMENDMENT 1)

INCITS 358-2002[R2012] Information technology - BioAPI Specification (change control held by the BioAPI Consortium)

INCITS/ISO/IEC 19784-1:2006[R2012] Information technology - BioAPI - Biometric Application Programming Interface - Part 1: BioAPI Specification

INCITS/ISO/IEC 19794-6:2005[R2012] Information technology - Biometric Data Interchange Formats - Part 6: Iris Image Data

INCITS/ISO/IEC 19794-5:2005[R2012] Information technology - Biometric Data Interchange Formats - Part 5: Face Image Data

INCITS/ISO/IEC 19794-4:2005[R2012] Information technology - Biometric Data Interchange Formats - Part 4: Finger Image Data

INCITS/ISO/IEC 19794-9:2007[R2012] Information technology - Biometric Data Interchange Formats - Part 9: Vascular Biometric Image Data

INCITS/ISO/IEC 19794-3:2006[R2012] Information technology - Biometric Data Interchange Formats - Part 3: Finger Pattern Spectral Data

INCITS/ISO/IEC 19794-2:2005[R2012] Information technology - Biometric Data Interchange Formats - Part 2: Finger Minutiae Data

INCITS/ISO/IEC 19794-7:2007[R2012] Information technology - Biometric Data Interchange Formats - Part 7: Sign/Signature Series Data

INCITS/ISO/IEC 19794-1:2006[R2012] Information technology - Biometric Data Interchange Formats - Part 1: Framework

INCITS/ISO/IEC 19794-10:2007[R2012] Information technology - Biometric Data Interchange Formats - Part 10: Hand Geometry Silhouette Data

INCITS/ISO/IEC 19795-1:2006[R2012] Information technology - Biometric Performance Testing and Reporting - Part 1: Principles and Framework

INCITS/ISO/IEC 13568:2002[R2012] Information Technology - Programming Languages - Z formal specification notation

INCITS/ISO/IEC 13211-1:1995[R2012] Prolog Language Standard Part 1: General Core

INCITS/ISO/IEC 16262:2011[2012] Information technology -- Programming languages, their environments and system software interfaces -- ECMAScript language specification

INCITS/ISO/IEC 9899:2011[2012] Programming Language C

INCITS/ISO/IEC 14776-372:2011[2012] Information technology -- Small Computer System Interface (SCSI) -- Part 372: SCSI Enclosure Services - 2 (SES-2)

INCITS 497-2012 Information technology - Automation/Drive Interface Commands - 3 (ADC-3)

INCITS 365-2002[R2012] Information technology - SCSI RDMA (SRP)

INCITS 468-2010/AM 1-2012 Information technology - Multimedia Command Set - 6 (MMC-6)

INCITS 430-2007[R2012] Information technology - MultiMedia Command Set version 5 (MMC-5)

INCITS 431-2007[R2012] Information technology - SCSI/ATA Translation (SAT)

INCITS 484-2012 Information technology - SCSI Media Changer Commands - 3 (SMC-3)

INCITS 495-2012[] Information technology - Platform Management Specification

INCITS 498-2012 Information technology - CIM Representations for Management Specification

INCITS 483-2012 Information technology - Virtualization Management Specification

INCITS 462-2010/AM1-2012 Information technology - Fibre Channel - Backbone - 5 AMENDMENT 1 (FC-BB-5/AM 1)

INCITS 496-2012 Information technology - Fibre Channel Security Protocol 2 (FC-SP-2)

INCITS 493-2012 Information technology - AT Attachment-8 - ATA/ATAPI Serial Transport (ATA8-AST)

INCITS 482-2012 Information technology - ATA/ATAPI Command Set -2 (ACS-2)

INCITS/ISO/IEC 13235-1:1998[R2012] Information Technology - Open Distributed Processing - Trading Function - Part 1: Specification

INCITS/ISO/IEC 13235-3:1998[R2012] Information Technology - Open Distributed Processing - Trading Function Part 3: Provision of Trading Function using OSI Directory Service

INCITS/ISO 9542:1998[R2012] Information technology - End System to Intermediate Systems Routeing Exchange Protocol for use in conjunction with the Protocol for Providing the Connectionless-Mode Network Service

INCITS/ISO/IEC 10589:2002[R2012] Intermediate system to intermediate system intra-domain-routeing routine information exchange protocol for use in conjunction with the protocol for providing the connectionless-mode Network Service (ISO 8473)

INCITS/ISO/IEC 10030:1995[R2012] Information technology-Telecommunications and information exchange between systems-End System Routeing Information Exchange Protocol for use in conjunction with ISO/IEC 8878

INCITS/ISO/IEC 10746-4:1998[R2012] Information Technology - Open Distributed Processing - Reference Model - Open Distributed Processing - Part 4: Architectural Semantics

INCITS/ISO/IEC 10746-1:1998[R2012] Information Technology - Open Distributed Processing - Reference Model - Open Distributed Processing - Part 1: Overview

INCITS/ISO/IEC 10746-4:1998/AM1:2001[R2012] Information technology - Open Distributed Processing - Part 4: Architectural Semantics - Amendment 1: Computational formalization

INCITS/ISO/IEC 29136:2012[2012] Information technology - Accessibility of personal computer hardware

INCITS/ISO/IEC 29103:2011[2012] Information technology-Office Equipment-Colour photo test pages for measurement of ink cartridge yield for colour photo printing
Document State Public Review Register/Notices (Public Review Register/Notices)
Group / Folder Executive Board / EB Document Registers - Previous Years / EB Document Register 2017
Submitter By Deborah Spittle on Wednesday, 07 June 2017 08:17am
Modified By Rachel Porter on Friday, 16 June 2017 12:12pm
Public URL https://standards.incits.org/apps/group_public/document.php?document_id=88634&wg_abbrev=eb

Referenced Items

Name Type Date

e. BSR-8 to ANSI to initiate the public review & Comment register generated

Last Updated: 2017-06-08

Submission of BSR-8 form to ANSI to initiate the 60-day public review and comment period. Comments should be submitted to comments@standards.incits.org. The Public review and comment period requires a register to be generated announcing the public review. If comments are received, the register is updated. Project state is 'Public Review'

page=ballotrefitems&type=document
e. BSR-8 to ANSI to initiate the public review & Comment register generated Activity (Document) 2017-06-08 No Access

e. BSR-8 to ANSI to initiate the public review & Comment register generated

Last Updated: 2017-06-08

Submission of BSR-8 form to ANSI to initiate the 60-day public review and comment period. Comments should be submitted to comments@standards.incits.org. The Public review and comment period requires a register to be generated announcing the public review. If comments are received, the register is updated. Project state is 'Public Review'

page=ballotrefitems&type=document
e. BSR-8 to ANSI to initiate the public review & Comment register generated Activity (Document) 2017-06-08 No Access

e. BSR-8 to ANSI to initiate the public review & Comment register generated

Last Updated: 2017-06-08

Submission of BSR-8 form to ANSI to initiate the 60-day public review and comment period. Comments should be submitted to comments@standards.incits.org. The Public review and comment period requires a register to be generated announcing the public review. If comments are received, the register is updated. Project state is 'Public Review'

page=ballotrefitems&type=document
e. BSR-8 to ANSI to initiate the public review & Comment register generated Activity (Document) 2017-06-08 No Access

e. BSR-8 to ANSI to initiate the public review & Comment register generated

Last Updated: 2017-06-08

Submission of BSR-8 form to ANSI to initiate the 60-day public review and comment period. Comments should be submitted to comments@standards.incits.org. The Public review and comment period requires a register to be generated announcing the public review. If comments are received, the register is updated. Project state is 'Public Review'

page=ballotrefitems&type=document
e. BSR-8 to ANSI to initiate the public review & Comment register generated Activity (Document) 2017-06-08 No Access

e. BSR-8 to ANSI to initiate the public review & Comment register generated

Last Updated: 2017-06-08

Submission of BSR-8 form to ANSI to initiate the 60-day public review and comment period. Comments should be submitted to comments@standards.incits.org. The Public review and comment period requires a register to be generated announcing the public review. If comments are received, the register is updated. Project state is 'Public Review'

page=ballotrefitems&type=document
e. BSR-8 to ANSI to initiate the public review & Comment register generated Activity (Document) 2017-06-08 No Access

e. BSR-8 to ANSI to initiate the public review & Comment register generated

Last Updated: 2017-06-08

Submission of BSR-8 form to ANSI to initiate the 60-day public review and comment period. Comments should be submitted to comments@standards.incits.org. The Public review and comment period requires a register to be generated announcing the public review. If comments are received, the register is updated. Project state is 'Public Review'

page=ballotrefitems&type=document
e. BSR-8 to ANSI to initiate the public review & Comment register generated Activity (Document) 2017-06-08 No Access

e. BSR-8 to ANSI to initiate the public review & Comment register generated

Last Updated: 2017-06-08

Submission of BSR-8 form to ANSI to initiate the 60-day public review and comment period. Comments should be submitted to comments@standards.incits.org. The Public review and comment period requires a register to be generated announcing the public review. If comments are received, the register is updated. Project state is 'Public Review'

page=ballotrefitems&type=document
e. BSR-8 to ANSI to initiate the public review & Comment register generated Activity (Document) 2017-06-08 No Access

e. BSR-8 to ANSI to initiate the public review & Comment register generated

Last Updated: 2017-06-08

Submission of BSR-8 form to ANSI to initiate the 60-day public review and comment period. Comments should be submitted to comments@standards.incits.org. The Public review and comment period requires a register to be generated announcing the public review. If comments are received, the register is updated. Project state is 'Public Review'

page=ballotrefitems&type=document
e. BSR-8 to ANSI to initiate the public review & Comment register generated Activity (Document) 2017-06-08 No Access

e. BSR-8 to ANSI to initiate the public review & Comment register generated

Last Updated: 2017-06-08

Submission of BSR-8 form to ANSI to initiate the 60-day public review and comment period. Comments should be submitted to comments@standards.incits.org. The Public review and comment period requires a register to be generated announcing the public review. If comments are received, the register is updated. Project state is 'Public Review'

page=ballotrefitems&type=document
e. BSR-8 to ANSI to initiate the public review & Comment register generated Activity (Document) 2017-06-08 No Access

e. BSR-8 to ANSI to initiate the public review & Comment register generated

Last Updated: 2017-06-08

Submission of BSR-8 form to ANSI to initiate the 60-day public review and comment period. Comments should be submitted to comments@standards.incits.org. The Public review and comment period requires a register to be generated announcing the public review. If comments are received, the register is updated. Project state is 'Public Review'

page=ballotrefitems&type=document
e. BSR-8 to ANSI to initiate the public review & Comment register generated Activity (Document) 2017-06-08 No Access

e. BSR-8 to ANSI to initiate the public review & Comment register generated

Last Updated: 2017-06-08

Submission of BSR-8 form to ANSI to initiate the 60-day public review and comment period. Comments should be submitted to comments@standards.incits.org. The Public review and comment period requires a register to be generated announcing the public review. If comments are received, the register is updated. Project state is 'Public Review'

page=ballotrefitems&type=document
e. BSR-8 to ANSI to initiate the public review & Comment register generated Activity (Document) 2017-06-08 No Access

e. BSR-8 to ANSI to initiate the public review & Comment register generated

Last Updated: 2017-06-08

Submission of BSR-8 form to ANSI to initiate the 60-day public review and comment period. Comments should be submitted to comments@standards.incits.org. The Public review and comment period requires a register to be generated announcing the public review. If comments are received, the register is updated. Project state is 'Public Review'

page=ballotrefitems&type=document
e. BSR-8 to ANSI to initiate the public review & Comment register generated Activity (Document) 2017-06-08 No Access

e. BSR-8 to ANSI to initiate the public review & Comment register generated

Last Updated: 2017-06-08

Submission of BSR-8 form to ANSI to initiate the 60-day public review and comment period. Comments should be submitted to comments@standards.incits.org. The Public review and comment period requires a register to be generated announcing the public review. If comments are received, the register is updated. Project state is 'Public Review'

page=ballotrefitems&type=document
e. BSR-8 to ANSI to initiate the public review & Comment register generated Activity (Document) 2017-06-08 No Access

e. BSR-8 to ANSI to initiate the public review & Comment register generated

Last Updated: 2017-06-08

Submission of BSR-8 form to ANSI to initiate the 60-day public review and comment period. Comments should be submitted to comments@standards.incits.org. The Public review and comment period requires a register to be generated announcing the public review. If comments are received, the register is updated. Project state is 'Public Review'

page=ballotrefitems&type=document
e. BSR-8 to ANSI to initiate the public review & Comment register generated Activity (Document) 2017-06-08 No Access

e. BSR-8 to ANSI to initiate the public review & Comment register generated

Last Updated: 2017-06-08

Submission of BSR-8 form to ANSI to initiate the 60-day public review and comment period. Comments should be submitted to comments@standards.incits.org. The Public review and comment period requires a register to be generated announcing the public review. If comments are received, the register is updated. Project state is 'Public Review'

page=ballotrefitems&type=document
e. BSR-8 to ANSI to initiate the public review & Comment register generated Activity (Document) 2017-06-08 No Access

e. BSR-8 to ANSI to initiate the public review & Comment register generated

Last Updated: 2017-06-08

Submission of BSR-8 form to ANSI to initiate the 60-day public review and comment period. Comments should be submitted to comments@standards.incits.org. The Public review and comment period requires a register to be generated announcing the public review. If comments are received, the register is updated. Project state is 'Public Review'

page=ballotrefitems&type=document
e. BSR-8 to ANSI to initiate the public review & Comment register generated Activity (Document) 2017-06-08 No Access

e. BSR-8 to ANSI to initiate the public review & Comment register generated

Last Updated: 2017-06-08

Submission of BSR-8 form to ANSI to initiate the 60-day public review and comment period. Comments should be submitted to comments@standards.incits.org. The Public review and comment period requires a register to be generated announcing the public review. If comments are received, the register is updated. Project state is 'Public Review'

page=ballotrefitems&type=document
e. BSR-8 to ANSI to initiate the public review & Comment register generated Activity (Document) 2017-06-08 No Access

e. BSR-8 to ANSI to initiate the public review & Comment register generated

Last Updated: 2017-06-08

Submission of BSR-8 form to ANSI to initiate the 60-day public review and comment period. Comments should be submitted to comments@standards.incits.org. The Public review and comment period requires a register to be generated announcing the public review. If comments are received, the register is updated. Project state is 'Public Review'

page=ballotrefitems&type=document
e. BSR-8 to ANSI to initiate the public review & Comment register generated Activity (Document) 2017-06-08 No Access

e. BSR-8 to ANSI to initiate the public review & Comment register generated

Last Updated: 2017-06-08

Submission of BSR-8 form to ANSI to initiate the 60-day public review and comment period. Comments should be submitted to comments@standards.incits.org. The Public review and comment period requires a register to be generated announcing the public review. If comments are received, the register is updated. Project state is 'Public Review'

page=ballotrefitems&type=document
e. BSR-8 to ANSI to initiate the public review & Comment register generated Activity (Document) 2017-06-08 No Access

e. BSR-8 to ANSI to initiate the public review & Comment register generated

Last Updated: 2017-06-08

Submission of BSR-8 form to ANSI to initiate the 60-day public review and comment period. Comments should be submitted to comments@standards.incits.org. The Public review and comment period requires a register to be generated announcing the public review. If comments are received, the register is updated. Project state is 'Public Review'

page=ballotrefitems&type=document
e. BSR-8 to ANSI to initiate the public review & Comment register generated Activity (Document) 2017-06-08 No Access

e. BSR-8 to ANSI to initiate the public review & Comment register generated

Last Updated: 2017-06-08

Submission of BSR-8 form to ANSI to initiate the 60-day public review and comment period. Comments should be submitted to comments@standards.incits.org. The Public review and comment period requires a register to be generated announcing the public review. If comments are received, the register is updated. Project state is 'Public Review'

page=ballotrefitems&type=document
e. BSR-8 to ANSI to initiate the public review & Comment register generated Activity (Document) 2017-06-08 No Access

e. BSR-8 to ANSI to initiate the public review & Comment register generated

Last Updated: 2017-06-08

Submission of BSR-8 form to ANSI to initiate the 60-day public review and comment period. Comments should be submitted to comments@standards.incits.org. The Public review and comment period requires a register to be generated announcing the public review. If comments are received, the register is updated. Project state is 'Public Review'

page=ballotrefitems&type=document
e. BSR-8 to ANSI to initiate the public review & Comment register generated Activity (Document) 2017-06-08 No Access

e. BSR-8 to ANSI to initiate the public review & Comment register generated

Last Updated: 2017-06-08

Submission of BSR-8 form to ANSI to initiate the 60-day public review and comment period. Comments should be submitted to comments@standards.incits.org. The Public review and comment period requires a register to be generated announcing the public review. If comments are received, the register is updated. Project state is 'Public Review'

page=ballotrefitems&type=document
e. BSR-8 to ANSI to initiate the public review & Comment register generated Activity (Document) 2017-06-08 No Access

e. BSR-8 to ANSI to initiate the public review & Comment register generated

Last Updated: 2017-06-08

Submission of BSR-8 form to ANSI to initiate the 60-day public review and comment period. Comments should be submitted to comments@standards.incits.org. The Public review and comment period requires a register to be generated announcing the public review. If comments are received, the register is updated. Project state is 'Public Review'

page=ballotrefitems&type=document
e. BSR-8 to ANSI to initiate the public review & Comment register generated Activity (Document) 2017-06-08 No Access

e. BSR-8 to ANSI to initiate the public review & Comment register generated

Last Updated: 2017-06-08

Submission of BSR-8 form to ANSI to initiate the 60-day public review and comment period. Comments should be submitted to comments@standards.incits.org. The Public review and comment period requires a register to be generated announcing the public review. If comments are received, the register is updated. Project state is 'Public Review'

page=ballotrefitems&type=document
e. BSR-8 to ANSI to initiate the public review & Comment register generated Activity (Document) 2017-06-08 No Access

e. BSR-8 to ANSI to initiate the public review & Comment register generated

Last Updated: 2017-06-08

Submission of BSR-8 form to ANSI to initiate the 60-day public review and comment period. Comments should be submitted to comments@standards.incits.org. The Public review and comment period requires a register to be generated announcing the public review. If comments are received, the register is updated. Project state is 'Public Review'

page=ballotrefitems&type=document
e. BSR-8 to ANSI to initiate the public review & Comment register generated Activity (Document) 2017-06-08 No Access

e. BSR-8 to ANSI to initiate the public review & Comment register generated

Last Updated: 2017-06-08

Submission of BSR-8 form to ANSI to initiate the 60-day public review and comment period. Comments should be submitted to comments@standards.incits.org. The Public review and comment period requires a register to be generated announcing the public review. If comments are received, the register is updated. Project state is 'Public Review'

page=ballotrefitems&type=document
e. BSR-8 to ANSI to initiate the public review & Comment register generated Activity (Document) 2017-06-08 No Access

e. BSR-8 to ANSI to initiate the public review & Comment register generated

Last Updated: 2017-06-08

Submission of BSR-8 form to ANSI to initiate the 60-day public review and comment period. Comments should be submitted to comments@standards.incits.org. The Public review and comment period requires a register to be generated announcing the public review. If comments are received, the register is updated. Project state is 'Public Review'

page=ballotrefitems&type=document
e. BSR-8 to ANSI to initiate the public review & Comment register generated Activity (Document) 2017-06-08 No Access

e. BSR-8 to ANSI to initiate the public review & Comment register generated

Last Updated: 2017-06-16

Submission of BSR-8 form to ANSI to initiate the 60-day public review and comment period. Comments should be submitted to comments@standards.incits.org. The Public review and comment period requires a register to be generated announcing the public review. If comments are received, the register is updated. Project state is 'Public Review'

page=ballotrefitems&type=document
e. BSR-8 to ANSI to initiate the public review & Comment register generated Activity (Document) 2017-06-16 No Access

e. BSR-8 to ANSI to initiate the public review & Comment register generated

Last Updated: 2017-06-16

Submission of BSR-8 form to ANSI to initiate the 60-day public review and comment period. Comments should be submitted to comments@standards.incits.org. The Public review and comment period requires a register to be generated announcing the public review. If comments are received, the register is updated. Project state is 'Public Review'

page=ballotrefitems&type=document
e. BSR-8 to ANSI to initiate the public review & Comment register generated Activity (Document) 2017-06-16 No Access

e. BSR-8 to ANSI to initiate the public review & Comment register generated

Last Updated: 2017-06-16

Submission of BSR-8 form to ANSI to initiate the 60-day public review and comment period. Comments should be submitted to comments@standards.incits.org. The Public review and comment period requires a register to be generated announcing the public review. If comments are received, the register is updated. Project state is 'Public Review'

page=ballotrefitems&type=document
e. BSR-8 to ANSI to initiate the public review & Comment register generated Activity (Document) 2017-06-16 No Access

e. BSR-8 to ANSI to initiate the public review & Comment register generated

Last Updated: 2017-06-16

Submission of BSR-8 form to ANSI to initiate the 60-day public review and comment period. Comments should be submitted to comments@standards.incits.org. The Public review and comment period requires a register to be generated announcing the public review. If comments are received, the register is updated. Project state is 'Public Review'

page=ballotrefitems&type=document
e. BSR-8 to ANSI to initiate the public review & Comment register generated Activity (Document) 2017-06-16 No Access

e. BSR-8 to ANSI to initiate the public review & Comment register generated

Last Updated: 2017-06-16

Submission of BSR-8 form to ANSI to initiate the 60-day public review and comment period. Comments should be submitted to comments@standards.incits.org. The Public review and comment period requires a register to be generated announcing the public review. If comments are received, the register is updated. Project state is 'Public Review'

page=ballotrefitems&type=document
e. BSR-8 to ANSI to initiate the public review & Comment register generated Activity (Document) 2017-06-16 No Access

e. BSR-8 to ANSI to initiate the public review & Comment register generated

Last Updated: 2017-06-16

Submission of BSR-8 form to ANSI to initiate the 60-day public review and comment period. Comments should be submitted to comments@standards.incits.org. The Public review and comment period requires a register to be generated announcing the public review. If comments are received, the register is updated. Project state is 'Public Review'

page=ballotrefitems&type=document
e. BSR-8 to ANSI to initiate the public review & Comment register generated Activity (Document) 2017-06-16 No Access

e. BSR-8 to ANSI to initiate the public review & Comment register generated

Last Updated: 2017-06-16

Submission of BSR-8 form to ANSI to initiate the 60-day public review and comment period. Comments should be submitted to comments@standards.incits.org. The Public review and comment period requires a register to be generated announcing the public review. If comments are received, the register is updated. Project state is 'Public Review'

page=ballotrefitems&type=document
e. BSR-8 to ANSI to initiate the public review & Comment register generated Activity (Document) 2017-06-16 No Access

e. BSR-8 to ANSI to initiate the public review & Comment register generated

Last Updated: 2017-06-16

Submission of BSR-8 form to ANSI to initiate the 60-day public review and comment period. Comments should be submitted to comments@standards.incits.org. The Public review and comment period requires a register to be generated announcing the public review. If comments are received, the register is updated. Project state is 'Public Review'

page=ballotrefitems&type=document
e. BSR-8 to ANSI to initiate the public review & Comment register generated Activity (Document) 2017-06-16 No Access

e. BSR-8 to ANSI to initiate the public review & Comment register generated

Last Updated: 2017-06-16

Submission of BSR-8 form to ANSI to initiate the 60-day public review and comment period. Comments should be submitted to comments@standards.incits.org. The Public review and comment period requires a register to be generated announcing the public review. If comments are received, the register is updated. Project state is 'Public Review'

page=ballotrefitems&type=document
e. BSR-8 to ANSI to initiate the public review & Comment register generated Activity (Document) 2017-06-16 No Access

e. BSR-8 to ANSI to initiate the public review & Comment register generated

Last Updated: 2017-06-16

Submission of BSR-8 form to ANSI to initiate the 60-day public review and comment period. Comments should be submitted to comments@standards.incits.org. The Public review and comment period requires a register to be generated announcing the public review. If comments are received, the register is updated. Project state is 'Public Review'

page=ballotrefitems&type=document
e. BSR-8 to ANSI to initiate the public review & Comment register generated Activity (Document) 2017-06-16 No Access

e. BSR-8 to ANSI to initiate the public review & Comment register generated

Last Updated: 2017-06-16

Submission of BSR-8 form to ANSI to initiate the 60-day public review and comment period. Comments should be submitted to comments@standards.incits.org. The Public review and comment period requires a register to be generated announcing the public review. If comments are received, the register is updated. Project state is 'Public Review'

page=ballotrefitems&type=document
e. BSR-8 to ANSI to initiate the public review & Comment register generated Activity (Document) 2017-06-16 No Access

e. BSR-8 to ANSI to initiate the public review & Comment register generated

Last Updated: 2017-06-16

Submission of BSR-8 form to ANSI to initiate the 60-day public review and comment period. Comments should be submitted to comments@standards.incits.org. The Public review and comment period requires a register to be generated announcing the public review. If comments are received, the register is updated. Project state is 'Public Review'

page=ballotrefitems&type=document
e. BSR-8 to ANSI to initiate the public review & Comment register generated Activity (Document) 2017-06-16 No Access

e. BSR-8 to ANSI to initiate the public review & Comment register generated

Last Updated: 2017-06-16

Submission of BSR-8 form to ANSI to initiate the 60-day public review and comment period. Comments should be submitted to comments@standards.incits.org. The Public review and comment period requires a register to be generated announcing the public review. If comments are received, the register is updated. Project state is 'Public Review'

page=ballotrefitems&type=document
e. BSR-8 to ANSI to initiate the public review & Comment register generated Activity (Document) 2017-06-16 No Access

e. BSR-8 to ANSI to initiate the public review & Comment register generated

Last Updated: 2017-06-16

Submission of BSR-8 form to ANSI to initiate the 60-day public review and comment period. Comments should be submitted to comments@standards.incits.org. The Public review and comment period requires a register to be generated announcing the public review. If comments are received, the register is updated. Project state is 'Public Review'

page=ballotrefitems&type=document
e. BSR-8 to ANSI to initiate the public review & Comment register generated Activity (Document) 2017-06-16 No Access

e. BSR-8 to ANSI to initiate the public review & Comment register generated

Last Updated: 2017-06-16

Submission of BSR-8 form to ANSI to initiate the 60-day public review and comment period. Comments should be submitted to comments@standards.incits.org. The Public review and comment period requires a register to be generated announcing the public review. If comments are received, the register is updated. Project state is 'Public Review'

page=ballotrefitems&type=document
e. BSR-8 to ANSI to initiate the public review & Comment register generated Activity (Document) 2017-06-16 No Access

e. BSR-8 to ANSI to initiate the public review & Comment register generated

Last Updated: 2017-06-16

Submission of BSR-8 form to ANSI to initiate the 60-day public review and comment period. Comments should be submitted to comments@standards.incits.org. The Public review and comment period requires a register to be generated announcing the public review. If comments are received, the register is updated. Project state is 'Public Review'

page=ballotrefitems&type=document
e. BSR-8 to ANSI to initiate the public review & Comment register generated Activity (Document) 2017-06-16 No Access

e. BSR-8 to ANSI to initiate the public review & Comment register generated

Last Updated: 2017-06-16

Submission of BSR-8 form to ANSI to initiate the 60-day public review and comment period. Comments should be submitted to comments@standards.incits.org. The Public review and comment period requires a register to be generated announcing the public review. If comments are received, the register is updated. Project state is 'Public Review'

page=ballotrefitems&type=document
e. BSR-8 to ANSI to initiate the public review & Comment register generated Activity (Document) 2017-06-16 No Access

e. BSR-8 to ANSI to initiate the public review & Comment register generated

Last Updated: 2017-06-16

Submission of BSR-8 form to ANSI to initiate the 60-day public review and comment period. Comments should be submitted to comments@standards.incits.org. The Public review and comment period requires a register to be generated announcing the public review. If comments are received, the register is updated. Project state is 'Public Review'

page=ballotrefitems&type=document
e. BSR-8 to ANSI to initiate the public review & Comment register generated Activity (Document) 2017-06-16 No Access

e. BSR-8 to ANSI to initiate the public review & Comment register generated

Last Updated: 2017-06-16

Submission of BSR-8 form to ANSI to initiate the 60-day public review and comment period. Comments should be submitted to comments@standards.incits.org. The Public review and comment period requires a register to be generated announcing the public review. If comments are received, the register is updated. Project state is 'Public Review'

page=ballotrefitems&type=document
e. BSR-8 to ANSI to initiate the public review & Comment register generated Activity (Document) 2017-06-16 No Access

e. BSR-8 to ANSI to initiate the public review & Comment register generated

Last Updated: 2017-06-16

Submission of BSR-8 form to ANSI to initiate the 60-day public review and comment period. Comments should be submitted to comments@standards.incits.org. The Public review and comment period requires a register to be generated announcing the public review. If comments are received, the register is updated. Project state is 'Public Review'

page=ballotrefitems&type=document
e. BSR-8 to ANSI to initiate the public review & Comment register generated Activity (Document) 2017-06-16 No Access

e. BSR-8 to ANSI to initiate the public review & Comment register generated

Last Updated: 2017-06-16

Submission of BSR-8 form to ANSI to initiate the 60-day public review and comment period. Comments should be submitted to comments@standards.incits.org. The Public review and comment period requires a register to be generated announcing the public review. If comments are received, the register is updated. Project state is 'Public Review'

page=ballotrefitems&type=document
e. BSR-8 to ANSI to initiate the public review & Comment register generated Activity (Document) 2017-06-16 No Access

e. BSR-8 to ANSI to initiate the public review & Comment register generated

Last Updated: 2017-06-16

Submission of BSR-8 form to ANSI to initiate the 60-day public review and comment period. Comments should be submitted to comments@standards.incits.org. The Public review and comment period requires a register to be generated announcing the public review. If comments are received, the register is updated. Project state is 'Public Review'

page=ballotrefitems&type=document
e. BSR-8 to ANSI to initiate the public review & Comment register generated Activity (Document) 2017-06-16 No Access

e. BSR-8 to ANSI to initiate the public review & Comment register generated

Last Updated: 2017-06-16

Submission of BSR-8 form to ANSI to initiate the 60-day public review and comment period. Comments should be submitted to comments@standards.incits.org. The Public review and comment period requires a register to be generated announcing the public review. If comments are received, the register is updated. Project state is 'Public Review'

page=ballotrefitems&type=document
e. BSR-8 to ANSI to initiate the public review & Comment register generated Activity (Document) 2017-06-16 No Access

e. BSR-8 to ANSI to initiate the public review & Comment register generated

Last Updated: 2017-06-16

Submission of BSR-8 form to ANSI to initiate the 60-day public review and comment period. Comments should be submitted to comments@standards.incits.org. The Public review and comment period requires a register to be generated announcing the public review. If comments are received, the register is updated. Project state is 'Public Review'

page=ballotrefitems&type=document
e. BSR-8 to ANSI to initiate the public review & Comment register generated Activity (Document) 2017-06-16 No Access

e. BSR-8 to ANSI to initiate the public review & Comment register generated

Last Updated: 2017-06-16

Submission of BSR-8 form to ANSI to initiate the 60-day public review and comment period. Comments should be submitted to comments@standards.incits.org. The Public review and comment period requires a register to be generated announcing the public review. If comments are received, the register is updated. Project state is 'Public Review'

page=ballotrefitems&type=document
e. BSR-8 to ANSI to initiate the public review & Comment register generated Activity (Document) 2017-06-16 No Access

e. BSR-8 to ANSI to initiate the public review & Comment register generated

Last Updated: 2017-06-16

Submission of BSR-8 form to ANSI to initiate the 60-day public review and comment period. Comments should be submitted to comments@standards.incits.org. The Public review and comment period requires a register to be generated announcing the public review. If comments are received, the register is updated. Project state is 'Public Review'

page=ballotrefitems&type=document
e. BSR-8 to ANSI to initiate the public review & Comment register generated Activity (Document) 2017-06-16 No Access

e. BSR-8 to ANSI to initiate the public review & Comment register generated

Last Updated: 2017-06-16

Submission of BSR-8 form to ANSI to initiate the 60-day public review and comment period. Comments should be submitted to comments@standards.incits.org. The Public review and comment period requires a register to be generated announcing the public review. If comments are received, the register is updated. Project state is 'Public Review'

page=ballotrefitems&type=document
e. BSR-8 to ANSI to initiate the public review & Comment register generated Activity (Document) 2017-06-16 No Access

e. BSR-8 to ANSI to initiate the public review & Comment register generated

Last Updated: 2017-06-19

Submission of BSR-8 form to ANSI to initiate the 60-day public review and comment period. Comments should be submitted to comments@standards.incits.org. The Public review and comment period requires a register to be generated announcing the public review. If comments are received, the register is updated. Project state is 'Public Review'

page=ballotrefitems&type=document
e. BSR-8 to ANSI to initiate the public review & Comment register generated Activity (Document) 2017-06-19 No Access

e. BSR-8 to ANSI to initiate the public review & Comment register generated

Last Updated: 2017-06-19

Submission of BSR-8 form to ANSI to initiate the 60-day public review and comment period. Comments should be submitted to comments@standards.incits.org. The Public review and comment period requires a register to be generated announcing the public review. If comments are received, the register is updated. Project state is 'Public Review'

page=ballotrefitems&type=document
e. BSR-8 to ANSI to initiate the public review & Comment register generated Activity (Document) 2017-06-19 No Access

e. BSR-8 to ANSI to initiate the public review & Comment register generated

Last Updated: 2017-06-29

Submission of BSR-8 form to ANSI to initiate the 60-day public review and comment period. Comments should be submitted to comments@standards.incits.org. The Public review and comment period requires a register to be generated announcing the public review. If comments are received, the register is updated. Project state is 'Public Review'

page=ballotrefitems&type=document
e. BSR-8 to ANSI to initiate the public review & Comment register generated Activity (Document) 2017-06-29 No Access

e. BSR-8 to ANSI to initiate the public review & Comment register generated

Last Updated: 2017-06-29

Submission of BSR-8 form to ANSI to initiate the 60-day public review and comment period. Comments should be submitted to comments@standards.incits.org. The Public review and comment period requires a register to be generated announcing the public review. If comments are received, the register is updated. Project state is 'Public Review'

page=ballotrefitems&type=document
e. BSR-8 to ANSI to initiate the public review & Comment register generated Activity (Document) 2017-06-29 No Access

e. BSR-8 to ANSI to initiate the public review & Comment register generated

Last Updated: 2017-06-29

Submission of BSR-8 form to ANSI to initiate the 60-day public review and comment period. Comments should be submitted to comments@standards.incits.org. The Public review and comment period requires a register to be generated announcing the public review. If comments are received, the register is updated. Project state is 'Public Review'

page=ballotrefitems&type=document
e. BSR-8 to ANSI to initiate the public review & Comment register generated Activity (Document) 2017-06-29 No Access

e. BSR-8 to ANSI to initiate the public review & Comment register generated

Last Updated: 2017-06-29

Submission of BSR-8 form to ANSI to initiate the 60-day public review and comment period. Comments should be submitted to comments@standards.incits.org. The Public review and comment period requires a register to be generated announcing the public review. If comments are received, the register is updated. Project state is 'Public Review'

page=ballotrefitems&type=document
e. BSR-8 to ANSI to initiate the public review & Comment register generated Activity (Document) 2017-06-29 No Access

e. BSR-8 to ANSI to initiate the public review & Comment register generated

Last Updated: 2017-06-29

Submission of BSR-8 form to ANSI to initiate the 60-day public review and comment period. Comments should be submitted to comments@standards.incits.org. The Public review and comment period requires a register to be generated announcing the public review. If comments are received, the register is updated. Project state is 'Public Review'

page=ballotrefitems&type=document
e. BSR-8 to ANSI to initiate the public review & Comment register generated Activity (Document) 2017-06-29 No Access

e. BSR-8 to ANSI to initiate the public review & Comment register generated

Last Updated: 2017-06-29

Submission of BSR-8 form to ANSI to initiate the 60-day public review and comment period. Comments should be submitted to comments@standards.incits.org. The Public review and comment period requires a register to be generated announcing the public review. If comments are received, the register is updated. Project state is 'Public Review'

page=ballotrefitems&type=document
e. BSR-8 to ANSI to initiate the public review & Comment register generated Activity (Document) 2017-06-29 No Access

e. BSR-8 to ANSI to initiate the public review & Comment register generated

Last Updated: 2017-06-29

Submission of BSR-8 form to ANSI to initiate the 60-day public review and comment period. Comments should be submitted to comments@standards.incits.org. The Public review and comment period requires a register to be generated announcing the public review. If comments are received, the register is updated. Project state is 'Public Review'

page=ballotrefitems&type=document
e. BSR-8 to ANSI to initiate the public review & Comment register generated Activity (Document) 2017-06-29 No Access

e. BSR-8 to ANSI to initiate the public review & Comment register generated

Last Updated: 2017-06-29

Submission of BSR-8 form to ANSI to initiate the 60-day public review and comment period. Comments should be submitted to comments@standards.incits.org. The Public review and comment period requires a register to be generated announcing the public review. If comments are received, the register is updated. Project state is 'Public Review'

page=ballotrefitems&type=document
e. BSR-8 to ANSI to initiate the public review & Comment register generated Activity (Document) 2017-06-29 No Access

e. BSR-8 to ANSI to initiate the public review & Comment register generated

Last Updated: 2017-06-29

Submission of BSR-8 form to ANSI to initiate the 60-day public review and comment period. Comments should be submitted to comments@standards.incits.org. The Public review and comment period requires a register to be generated announcing the public review. If comments are received, the register is updated. Project state is 'Public Review'

page=ballotrefitems&type=document
e. BSR-8 to ANSI to initiate the public review & Comment register generated Activity (Document) 2017-06-29 No Access

e. BSR-8 to ANSI to initiate the public review & Comment register generated

Last Updated: 2017-06-29

Submission of BSR-8 form to ANSI to initiate the 60-day public review and comment period. Comments should be submitted to comments@standards.incits.org. The Public review and comment period requires a register to be generated announcing the public review. If comments are received, the register is updated. Project state is 'Public Review'

page=ballotrefitems&type=document
e. BSR-8 to ANSI to initiate the public review & Comment register generated Activity (Document) 2017-06-29 No Access

e. BSR-8 to ANSI to initiate the public review & Comment register generated

Last Updated: 2017-06-29

Submission of BSR-8 form to ANSI to initiate the 60-day public review and comment period. Comments should be submitted to comments@standards.incits.org. The Public review and comment period requires a register to be generated announcing the public review. If comments are received, the register is updated. Project state is 'Public Review'

page=ballotrefitems&type=document
e. BSR-8 to ANSI to initiate the public review & Comment register generated Activity (Document) 2017-06-29 No Access

e. BSR-8 to ANSI to initiate the public review & Comment register generated

Last Updated: 2017-07-06

Submission of BSR-8 form to ANSI to initiate the 60-day public review and comment period. Comments should be submitted to comments@standards.incits.org. The Public review and comment period requires a register to be generated announcing the public review. If comments are received, the register is updated. Project state is 'Public Review'

page=ballotrefitems&type=document
e. BSR-8 to ANSI to initiate the public review & Comment register generated Activity (Document) 2017-07-06 No Access

e. BSR-8 to ANSI to initiate the public review & Comment register generated

Last Updated: 2017-07-06

Submission of BSR-8 form to ANSI to initiate the 60-day public review and comment period. Comments should be submitted to comments@standards.incits.org. The Public review and comment period requires a register to be generated announcing the public review. If comments are received, the register is updated. Project state is 'Public Review'

page=ballotrefitems&type=document
e. BSR-8 to ANSI to initiate the public review & Comment register generated Activity (Document) 2017-07-06 No Access

e. BSR-8 to ANSI to initiate the public review & Comment register generated

Last Updated: 2017-07-06

Submission of BSR-8 form to ANSI to initiate the 60-day public review and comment period. Comments should be submitted to comments@standards.incits.org. The Public review and comment period requires a register to be generated announcing the public review. If comments are received, the register is updated. Project state is 'Public Review'

page=ballotrefitems&type=document
e. BSR-8 to ANSI to initiate the public review & Comment register generated Activity (Document) 2017-07-06 No Access

e. BSR-8 to ANSI to initiate the public review & Comment register generated

Last Updated: 2017-07-06

Submission of BSR-8 form to ANSI to initiate the 60-day public review and comment period. Comments should be submitted to comments@standards.incits.org. The Public review and comment period requires a register to be generated announcing the public review. If comments are received, the register is updated. Project state is 'Public Review'

page=ballotrefitems&type=document
e. BSR-8 to ANSI to initiate the public review & Comment register generated Activity (Document) 2017-07-06 No Access

e. BSR-8 to ANSI to initiate the public review & Comment register generated

Last Updated: 2017-07-07

Submission of BSR-8 form to ANSI to initiate the 60-day public review and comment period. Comments should be submitted to comments@standards.incits.org. The Public review and comment period requires a register to be generated announcing the public review. If comments are received, the register is updated. Project state is 'Public Review'

page=ballotrefitems&type=document
e. BSR-8 to ANSI to initiate the public review & Comment register generated Activity (Document) 2017-07-07 No Access

e. BSR-8 to ANSI to initiate the public review & Comment register generated

Last Updated: 2017-07-07

Submission of BSR-8 form to ANSI to initiate the 60-day public review and comment period. Comments should be submitted to comments@standards.incits.org. The Public review and comment period requires a register to be generated announcing the public review. If comments are received, the register is updated. Project state is 'Public Review'

page=ballotrefitems&type=document
e. BSR-8 to ANSI to initiate the public review & Comment register generated Activity (Document) 2017-07-07 No Access

e. BSR-8 to ANSI to initiate the public review & Comment register generated

Last Updated: 2017-07-07

Submission of BSR-8 form to ANSI to initiate the 60-day public review and comment period. Comments should be submitted to comments@standards.incits.org. The Public review and comment period requires a register to be generated announcing the public review. If comments are received, the register is updated. Project state is 'Public Review'

page=ballotrefitems&type=document
e. BSR-8 to ANSI to initiate the public review & Comment register generated Activity (Document) 2017-07-07 No Access

e. BSR-8 to ANSI to initiate the public review & Comment register generated

Last Updated: 2017-07-07

Submission of BSR-8 form to ANSI to initiate the 60-day public review and comment period. Comments should be submitted to comments@standards.incits.org. The Public review and comment period requires a register to be generated announcing the public review. If comments are received, the register is updated. Project state is 'Public Review'

page=ballotrefitems&type=document
e. BSR-8 to ANSI to initiate the public review & Comment register generated Activity (Document) 2017-07-07 No Access

e. BSR-8 to ANSI to initiate the public review & Comment register generated

Last Updated: 2017-07-07

Submission of BSR-8 form to ANSI to initiate the 60-day public review and comment period. Comments should be submitted to comments@standards.incits.org. The Public review and comment period requires a register to be generated announcing the public review. If comments are received, the register is updated. Project state is 'Public Review'

page=ballotrefitems&type=document
e. BSR-8 to ANSI to initiate the public review & Comment register generated Activity (Document) 2017-07-07 No Access

e. BSR-8 to ANSI to initiate the public review & Comment register generated

Last Updated: 2017-07-07

Submission of BSR-8 form to ANSI to initiate the 60-day public review and comment period. Comments should be submitted to comments@standards.incits.org. The Public review and comment period requires a register to be generated announcing the public review. If comments are received, the register is updated. Project state is 'Public Review'

page=ballotrefitems&type=document
e. BSR-8 to ANSI to initiate the public review & Comment register generated Activity (Document) 2017-07-07 No Access

e. BSR-8 to ANSI to initiate the public review & Comment register generated

Last Updated: 2017-07-07

Submission of BSR-8 form to ANSI to initiate the 60-day public review and comment period. Comments should be submitted to comments@standards.incits.org. The Public review and comment period requires a register to be generated announcing the public review. If comments are received, the register is updated. Project state is 'Public Review'

page=ballotrefitems&type=document
e. BSR-8 to ANSI to initiate the public review & Comment register generated Activity (Document) 2017-07-07 No Access

e. BSR-8 to ANSI to initiate the public review & Comment register generated

Last Updated: 2017-07-07

Submission of BSR-8 form to ANSI to initiate the 60-day public review and comment period. Comments should be submitted to comments@standards.incits.org. The Public review and comment period requires a register to be generated announcing the public review. If comments are received, the register is updated. Project state is 'Public Review'

page=ballotrefitems&type=document
e. BSR-8 to ANSI to initiate the public review & Comment register generated Activity (Document) 2017-07-07 No Access

e. BSR-8 to ANSI to initiate the public review & Comment register generated

Last Updated: 2017-07-07

Submission of BSR-8 form to ANSI to initiate the 60-day public review and comment period. Comments should be submitted to comments@standards.incits.org. The Public review and comment period requires a register to be generated announcing the public review. If comments are received, the register is updated. Project state is 'Public Review'

page=ballotrefitems&type=document
e. BSR-8 to ANSI to initiate the public review & Comment register generated Activity (Document) 2017-07-07 No Access

e. BSR-8 to ANSI to initiate the public review & Comment register generated

Last Updated: 2017-07-10

Submission of BSR-8 form to ANSI to initiate the 60-day public review and comment period. Comments should be submitted to comments@standards.incits.org. The Public review and comment period requires a register to be generated announcing the public review. If comments are received, the register is updated. Project state is 'Public Review'

page=ballotrefitems&type=document
e. BSR-8 to ANSI to initiate the public review & Comment register generated Activity (Document) 2017-07-10 No Access

e. BSR-8 to ANSI to initiate the public review & Comment register generated

Last Updated: 2017-07-10

Submission of BSR-8 form to ANSI to initiate the 60-day public review and comment period. Comments should be submitted to comments@standards.incits.org. The Public review and comment period requires a register to be generated announcing the public review. If comments are received, the register is updated. Project state is 'Public Review'

page=ballotrefitems&type=document
e. BSR-8 to ANSI to initiate the public review & Comment register generated Activity (Document) 2017-07-10 No Access

e. BSR-8 to ANSI to initiate the public review & Comment register generated

Last Updated: 2017-07-10

Submission of BSR-8 form to ANSI to initiate the 60-day public review and comment period. Comments should be submitted to comments@standards.incits.org. The Public review and comment period requires a register to be generated announcing the public review. If comments are received, the register is updated. Project state is 'Public Review'

page=ballotrefitems&type=document
e. BSR-8 to ANSI to initiate the public review & Comment register generated Activity (Document) 2017-07-10 No Access

e. BSR-8 to ANSI to initiate the public review & Comment register generated

Last Updated: 2017-07-10

Submission of BSR-8 form to ANSI to initiate the 60-day public review and comment period. Comments should be submitted to comments@standards.incits.org. The Public review and comment period requires a register to be generated announcing the public review. If comments are received, the register is updated. Project state is 'Public Review'

page=ballotrefitems&type=document
e. BSR-8 to ANSI to initiate the public review & Comment register generated Activity (Document) 2017-07-10 No Access

e. BSR-8 to ANSI to initiate the public review & Comment register generated

Last Updated: 2017-07-10

Submission of BSR-8 form to ANSI to initiate the 60-day public review and comment period. Comments should be submitted to comments@standards.incits.org. The Public review and comment period requires a register to be generated announcing the public review. If comments are received, the register is updated. Project state is 'Public Review'

page=ballotrefitems&type=document
e. BSR-8 to ANSI to initiate the public review & Comment register generated Activity (Document) 2017-07-10 No Access

e. BSR-8 to ANSI to initiate the public review & Comment register generated

Last Updated: 2017-07-10

Submission of BSR-8 form to ANSI to initiate the 60-day public review and comment period. Comments should be submitted to comments@standards.incits.org. The Public review and comment period requires a register to be generated announcing the public review. If comments are received, the register is updated. Project state is 'Public Review'

page=ballotrefitems&type=document
e. BSR-8 to ANSI to initiate the public review & Comment register generated Activity (Document) 2017-07-10 No Access

e. BSR-8 to ANSI to initiate the public review & Comment register generated

Last Updated: 2017-07-10

Submission of BSR-8 form to ANSI to initiate the 60-day public review and comment period. Comments should be submitted to comments@standards.incits.org. The Public review and comment period requires a register to be generated announcing the public review. If comments are received, the register is updated. Project state is 'Public Review'

page=ballotrefitems&type=document
e. BSR-8 to ANSI to initiate the public review & Comment register generated Activity (Document) 2017-07-10 No Access

e. BSR-8 to ANSI to initiate the public review & Comment register generated

Last Updated: 2017-07-21
page=ballotrefitems&type=document
e. BSR-8 to ANSI to initiate the public review & Comment register generated Activity (Document) 2017-07-21 No Access

e. BSR-8 to ANSI to initiate the public review & Comment register generated

Last Updated: 2017-08-22

Submission of BSR-8 form to ANSI to initiate the 60-day public review and comment period. Comments should be submitted to comments@standards.incits.org. The Public review and comment period requires a register to be generated announcing the public review. If comments are received, the register is updated. Project state is 'Public Review'

page=ballotrefitems&type=document
e. BSR-8 to ANSI to initiate the public review & Comment register generated Activity (Document) 2017-08-22 No Access

e. BSR-8 to ANSI to initiate the public review & Comment register generated

Last Updated: 2017-08-22

Submission of BSR-8 form to ANSI to initiate the 60-day public review and comment period. Comments should be submitted to comments@standards.incits.org. The Public review and comment period requires a register to be generated announcing the public review. If comments are received, the register is updated. Project state is 'Public Review'

page=ballotrefitems&type=document
e. BSR-8 to ANSI to initiate the public review & Comment register generated Activity (Document) 2017-08-22 No Access

e. BSR-8 to ANSI to initiate the public review & Comment register generated

Last Updated: 2017-09-15

Submission of BSR-8 form to ANSI to initiate the 60-day public review and comment period. Comments should be submitted to comments@standards.incits.org. The Public review and comment period requires a register to be generated announcing the public review. If comments are received, the register is updated. Project state is 'Public Review'

page=ballotrefitems&type=document
e. BSR-8 to ANSI to initiate the public review & Comment register generated Activity (Document) 2017-09-15 No Access

e. BSR-8 to ANSI to initiate the public review & Comment register generated

Last Updated: 2017-09-15

Submission of BSR-8 form to ANSI to initiate the 60-day public review and comment period. Comments should be submitted to comments@standards.incits.org. The Public review and comment period requires a register to be generated announcing the public review. If comments are received, the register is updated. Project state is 'Public Review'

page=ballotrefitems&type=document
e. BSR-8 to ANSI to initiate the public review & Comment register generated Activity (Document) 2017-09-15 No Access

e. BSR-8 to ANSI to initiate the public review & Comment register generated

Last Updated: 2017-09-15

Submission of BSR-8 form to ANSI to initiate the 60-day public review and comment period. Comments should be submitted to comments@standards.incits.org. The Public review and comment period requires a register to be generated announcing the public review. If comments are received, the register is updated. Project state is 'Public Review'

page=ballotrefitems&type=document
e. BSR-8 to ANSI to initiate the public review & Comment register generated Activity (Document) 2017-09-15 No Access

e. BSR-8 to ANSI to initiate the public review & Comment register generated

Last Updated: 2017-09-15

Submission of BSR-8 form to ANSI to initiate the 60-day public review and comment period. Comments should be submitted to comments@standards.incits.org. The Public review and comment period requires a register to be generated announcing the public review. If comments are received, the register is updated. Project state is 'Public Review'

page=ballotrefitems&type=document
e. BSR-8 to ANSI to initiate the public review & Comment register generated Activity (Document) 2017-09-15 No Access

e. BSR-8 to ANSI to initiate the public review & Comment register generated

Last Updated: 2017-09-15

Submission of BSR-8 form to ANSI to initiate the 60-day public review and comment period. Comments should be submitted to comments@standards.incits.org. The Public review and comment period requires a register to be generated announcing the public review. If comments are received, the register is updated. Project state is 'Public Review'

page=ballotrefitems&type=document
e. BSR-8 to ANSI to initiate the public review & Comment register generated Activity (Document) 2017-09-15 No Access

e. BSR-8 to ANSI to initiate the public review & Comment register generated

Last Updated: 2017-09-15

Submission of BSR-8 form to ANSI to initiate the 60-day public review and comment period. Comments should be submitted to comments@standards.incits.org. The Public review and comment period requires a register to be generated announcing the public review. If comments are received, the register is updated. Project state is 'Public Review'

page=ballotrefitems&type=document
e. BSR-8 to ANSI to initiate the public review & Comment register generated Activity (Document) 2017-09-15 No Access

e. BSR-8 to ANSI to initiate the public review & Comment register generated

Last Updated: 2017-09-15

Submission of BSR-8 form to ANSI to initiate the 60-day public review and comment period. Comments should be submitted to comments@standards.incits.org. The Public review and comment period requires a register to be generated announcing the public review. If comments are received, the register is updated. Project state is 'Public Review'

page=ballotrefitems&type=document
e. BSR-8 to ANSI to initiate the public review & Comment register generated Activity (Document) 2017-09-15 No Access

LB5651: Approval to Reaffirm American National Standards for 2017 National Maintenance

Open Date: 2017-08-15 00:00:00 America/New_York

Do you approve the reaffirmation of the American National Standards listed in eb-2017-00299?

All applicable INCITS technical committees were notified of their required action to provide recommendations for 2017 Five-Year National Maintenance via ICMS Action Item and document, eb-2017-00799-002. The standards listed in document in eb-2017-00299 were recommended for reaffirm by the following Technical Committees: *INCITS...

page=ballotrefitems&type=document
* LB5651: Approval to Reaffirm American National Standards for 2017 National Maintenance Ballot (Document) 2017-08-29 No Access